Skip to content

Electrical documentation for machines and production lines.

We develop EPLAN schematics and lists to your standards. We bring equipment, power and control data together in a consistent package for the next project teams.

Documentation for production

Scope of work

  • Power and control schematics in EPLAN Electric P8
  • Cabinet layouts, equipment, cable and terminal lists
  • I/O maps, addressing and network data
  • Calculations and safety documentation within the agreed scope

What we deliver

  • An editable project in the agreed EPLAN version
  • Schematics and lists for panel building and installation
  • Calculations and data lists required by the project standard

Proven in practice

Documentation for seven automotive stations

We produced the electrical schematics for seven stations, together with network, load and thermal documentation and a safety assessment.

View project

Nine PLC groups for a paint shop conveyor line

We prepared the electrical schematics for nine PLC groups, plus a complete package of calculations and lists for a paint shop conveyor line.

View project

Template project for a production station

We combined the requirements of two standards into one template project, which the client’s team could use to develop further stations.

View project

Six PLC groups for a paint shop conveyor line

We are developing the documentation for six PLC groups, phasing the work around the availability of input data and the client’s successive updates.

View project

From inputs to handover

  1. Step

    Define the inputs

    We review the materials, standard and responsibilities.

  2. Step

    Design

    We develop schematics and lists from the agreed inputs.

  3. Step

    Review and revise

    We keep related documentation consistent through successive updates.

  4. Step

    Handover

    We deliver the agreed package for the next project stage.

Before we start

  • Yes. Our automotive projects use customer base projects, macros and approved component lists. We agree the standard at the start.

  • We agree updates and their impact on schematics, addressing and lists. Scope and timing depend on the availability of inputs.

  • Yes. Our work includes standalone electrical documentation packages. Panel building and on-site work are agreed separately.

Discuss your project

Your standard, layout, equipment lists, control concept and target date. If inputs are incomplete, we agree which parts of the project can begin.

We use your data solely to respond to this enquiry.

Paweł Żebrowski, founder of PDI Automation, at his laptop