Documentation for seven automotive stations

We produced the electrical schematics for seven stations, together with network, load and thermal documentation and a safety assessment.

Related service: EPLAN electrical design ↗

Client
BMW · via thyssenkrupp Automation Engineering
Work type
Electrical design
Industry
Automotive
Period
Multi-phase project
07line stations
400 Vload calculations
24 Vload calculations

Project goal

We prepared complete electrical documentation for seven stations of an industrial line. Every station needed a consistent set of schematics, calculations and data for the teams working after us.

Project timeline

The stages in the order the scope was delivered.

  1. 01 / Stage

    Base project

    We set up the project in EPLAN Electric P8 2023 from the client’s base project, in the end client’s standard and with its device macros.

  2. 02 / Stage

    Input data

    We transferred devices and connections into the schematic from the station parts lists, the safety control concept and the approved parts list.

  3. 03 / Stage

    Station schematics

    We produced cabinet wiring, mounting layouts, field devices, construction plans, network topology, integration of the pneumatic schematics, and cable and terminal lists.

  4. 04 / Stage

    Calculations

    We calculated 400 V and 24 V network loads to size the protection, and the heat balance of every cabinet to size the cooling.

  5. 05 / Stage

    Addressing in SAS

    We assigned network and PLC addresses to the devices. The PLC programmers later worked from the file we prepared.

  6. 06 / Stage

    Lists and safety

    We checked the device list against the approved parts list and assessed each station’s safety level to ISO 13849-1 in SISTEMA.

Challenge

Input data was updated regularly, and a change to one device affected the schematic, addressing, bill of materials and safety documentation at once. We kept the whole package consistent through every iteration.

Result

We delivered documentation for all seven stations with the required supporting deliverables. Concept changes were carried through the whole package, so downstream teams always worked from consistent data.

Tools and scope

  • EPLAN Electric P8 2023
  • SAS
  • SISTEMA
  • ISO 13849-1
  • 400/24 V calculations