Twin Heater power cabinet
We built a stainless steel power cabinet, checked the connections and handed over the measurement documentation.
- Work type
- Cabinet assembly
- Industry
- Industrial installations
- Period
- 04.2026

Project goal
We built one power cabinet for the Twin Heater system, with measurement documentation and a check of every connection.
Project timeline
The stages in the order the scope was delivered.
- 01 / Stage
Quote and materials
We quoted the assembly and checked the materials needed.
- 02 / Stage
Components
We checked stock levels and the component orders on the client’s side.
- 03 / Stage
Assembly
We built the cabinet in a stainless steel enclosure, which calls for more precise machining.
- 04 / Stage
Measurements
We carried out measurements, checked the connections and handed over the measurement documentation.
Challenge
The stainless steel enclosure needed more precise and more time-consuming machining. We planned the work to keep that precision without moving the deadline.
Result
We handed over the cabinet and its measurement documentation on the agreed date. The photos show the actual workmanship of the devices, labelling and surge protection.
Tools and scope
- Cabinet assembly
- Stainless steel machining
- Measurements
- Connection checks