Assembly of five power distribution cabinets

We checked the documentation, prepared the layouts and built five power distribution cabinets, including measurements and a check of every connection.

Related service: Electrical panel building ↗

Client
Exyte
Work type
Cabinet assembly
Industry
Industrial installations
Period
05–08.2025
05cabinets delivered
04months of work
QCmeasurements and connection checks

Project goal

The task was to build five power distribution cabinets to the supplied technical documentation and get them ready for successive shipments on the client’s schedule.

Project timeline

The stages in the order the scope was delivered.

  1. 01 / Stage

    Documentation review

    We reviewed the electrical documentation supplied for the five cabinets before starting work.

  2. 02 / Stage

    Components

    We checked stock levels and ordered the components needed for assembly.

  3. 03 / Stage

    Cabinet layouts

    We prepared layouts to match the design to assembly practice and catch errors before building.

  4. 04 / Stage

    Assembly

    We built the cabinets in shipping order, updating the schedule as delivery times changed.

  5. 05 / Stage

    Testing and handover

    We carried out measurements and checked every connection before handover.

Challenge

Shipping dates for the cabinets were tight, and component lead times and team availability kept changing during the work. We updated the schedule to keep assembly, testing and acceptance in the right order.

Result

We built all five cabinets, checked the connections and handed over the full set on the agreed dates. The photos show the actual workmanship, labelling and wire routing.

Tools and scope

  • Electrical documentation
  • Cabinet layouts
  • Measurements
  • Connection checks